DSR PUNE 2012-13 PDF

1GENERAL NOTES Schedule of Rates is prepared for the year Operative from 1st Oct. and is applicable for P.W. Circle. Pune. This annual Progress Report for the year includes the important programmes and .. These are located in Mumbai (41), Thane (9) and Pune (38) district. These functioning .. DIC, Kolhapur DSR yet to be submitted. Dsr Pwd. Mumbai. Jun 19, -. PWD MAHARASHTRA. DSR. 17 Pune PWD DSR |. Deep dsr pune 13 pdf – dsr.

Author: Nekazahn Maumuro
Country: Antigua & Barbuda
Language: English (Spanish)
Genre: Software
Published (Last): 6 August 2017
Pages: 362
PDF File Size: 15.82 Mb
ePub File Size: 17.11 Mb
ISBN: 982-3-27603-896-1
Downloads: 39040
Price: Free* [*Free Regsitration Required]
Uploader: Bacage

R; which includes all taxes such as excise, CST, Terminal tax, vat,educational tax etc. DSR – Mdulo conceptual.

For floor to floor height more than 4. C Tor Steel H.

Tgs mklh dsr dsr pendidikan kel. For calculation of transportation charges rates tabulated in material master for following items are considered in the formula. Resolution Planning Department No. Statement A-1 – Material Master.

Current Schedule Rates P.W.D. DSR/CSR 16-17 Pune, Maharastra, India

Pipes, Pre stressed concrete pipes, A. The floor to floor height of 4. Bd-F Deals with the rate of concrete for grid slab, this item should be used for grid slab only i. Department vide letter No. F High Tensile Steel Rs.

Copy of Notification upne.

Rabtab DSR

Copy of Notification attached. DSR Pune pwd civil work rates Documents. Sugarcane factory area 10 Km. For supply items and providing Earth work in embankment of road materials lead is not considered in the rate analysis.

  DION FORTUNE THE MYSTICAL QABALAH PDF

DSR Pune – [PDF Document]

The cost per trip shown in statement C, also includes charges of running empty vehicle for return trip. For floor to floor height more than 4. Bd-F Deals with the rate of concrete for grid slab, this item should be used for grid slab only i. The same should be added in the rate analysis while framing the estimate and the amount shall be deducted from contractors bills as prescribed in the said G. The same should be added in the rate analysis while framing the estimate and the amount shall be deducted from contractors bills as prescribed in the said G.

Post on Nov 1.

Agency will have to produce documentary evidence to the concerned Executive Engineer, as regards payments made by Agency to Revenue Department towards royalty charges. No cumulative increase shall be done.

F High Tensile Steel Rs. In Specific conditions if cofferdam, caging etc. Directorate of Insurance Maharashtra State vide letter No. Refinery Mumbaib The above rates are as per the Rates charged by the main producers at their respective points of supply, as on the date of implementation of D.

The increase in rates as above should be on ground floor basic rates only. Instead the concerned Executive Engineer shall approve the mix design by taking into consideration necessary parameters.

Pwd Dsr Pune Documents. For following items of Bridge works the separate rate analysis shall be approved by the Territorial Superintending Engineer: Rate or prevailing stock issue rate, whichever is more.

  C15PH ZENER DIODE PDF

Current Schedule Rates P.W.D. DSR/CSR Pune, Maharastra, India – जरुरी Site

Pipes, Pre stressed concrete pipes, A. Rubble, Metal, Sand, Pund etc. Issue rates of Schedule A materials for above notified area shall be increased by respective percentage.

Pipes, cement blocks, steel, tar bitumen, roofing felt, floor asphalt, steel, mating, bamboos and Ballies of all size, ceiling board, rubber 201-213. Agency will have to produce documentary evidence to the concerned Executive Engineer, as regards payments made by Agency to Revenue Department towards royalty charges. Refinery Mumbaib The above rates are as per the Rates charged by the main producers at their respective points of supply, as on the date of implementation of D.

The increase in rates as above should be on ground floor basic rates only. Directorate of Insurance Maharashtra State vide letter No. The increase in rates as above should be applicable only one at a time e. If such documentary evidence is not produced the component of Royalty ds as contemplated in the item shall not be paid to Agency.

Copy attached in Pg.