AR 740-3 PDF

Find the most up-to-date version of AR at Engineering NOTE: AR is a Joint Service Instruction and is also DLAI , AFMAN (IP), NAVSUPINST A, MCO A (The true file name when . provide extensive information about AR ( ).

Author: Mezuru Voodoozuru
Country: Bolivia
Language: English (Spanish)
Genre: Environment
Published (Last): 13 December 2012
Pages: 163
PDF File Size: 3.35 Mb
ePub File Size: 11.73 Mb
ISBN: 174-5-59993-635-1
Downloads: 88249
Price: Free* [*Free Regsitration Required]
Uploader: Zuzil

This section sets forth DA policies and procedures for reporting the Armywide utilization and occupancy of storage space. Except for items determined suitable for open storage, supplies and equipment will not be positioned at any installation lacking adequate covered storage space. This regulation at the following subject areas: Place a note in the remarks block stating where the stock is located.

The improper conversion can usually be determined if the facility is listed on the Inventory of Real Military Property Listing and has a storage category code of,or The gross amount of storage space allocated to GSA, Property 740- and Disposal Service for storage of the specific commodities listed in column b. Learning Objectives Develop a plan to manage physical therapy equipment including: To ensure safe, economic and standardized procedures for the handling and transport of ammunition commodities.

Material so stored will be inspected every 36 months to insure the degree of unserviceability does not increase as a result of such exposure. Storage space management report. zr

File:Vasconia wide 3 – – Wikimedia Commons

Complete aircraft storage facilities. In the absence of a list of equipment to be pre—positioned, 90 percent of the storage objective will be provided CH storage and 10 percent will be provided another type of storage, as appropriate. Covered general purpose, controlled at You may not alter or remove any trademark, copyright or other notice from copies of the content. It does not allow for limitations which may be imposed by existing MHE, or floor load capacity; therefore, the TCF also is an indicator of theoretical capacity.

In requesting diversion of storage space, show economic evaluation of gains that will result if diversion recommended is approved. There is one exception to the above. Enter the total amount of vacant ACF in the bulk area.

  GLU3D TUTORIALS PDF

Entries will be rounded to the nearest hundred square feet or to the nearest thousand square feet as indicated above for column e. Engineering data generated during the tests will be recorded and maintained in support of the DOD Engineering for Transportability Program. It does not include space equipped with operating humidity control devices, areas specially designed for storage of flammable or hazardous materials conforming storage.

Prior to the acquisition or construction of ammunition or explosive facilities, a safety site zr must be submitted and approved. Cited in para These reports will include storage space that is primarily used for mission operations, regardless of the identity of the occupants, except space excluded in paragraph 4—13 above. Military Traffic Management Command.

Should the total amount of material be less than 1, pounds, the amount will be entered in pounds and so identified. East Camp and Training Area. Such testing may also be undertaken for the purpose of revising or establishing surveillance criteria or similar yardsticks for items currently in use or in stock.

All materials contained on this site are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published, broadcast, or in any way exploited without the prior written permission of Mentor Enterprises, Inc. Commissary and the supporting storage space. In addition, these drawings are available for use by other DOD agencies and private industry as appropriate.

McAlester Army Ammunition Plant. When an existing facility is being expanded, a requirement for support space will not be included as a storage space requirement unless covered storage is being used for support operations. Reinforced-concrete, earth-covered, arch-type magazines conforming to standard military department drawings, constructed on the surface of the terrain with an earth cover placed over the arch minimum of 2 feet of earth cover should be over the arch and rear of the structure.

Annotate the total number of bin and rack locations available and annotate the number of bin and rack locations occupied.

  CURSO ZODIACAL SAMAEL AUN WEOR PDF

AR 740-3 Stock Readiness

7403- Vacant ACF in bin area: Block stowed Storage of equipment in a block configuration without main or cross aisles. Material stowed on docks, roadways, etc. Request for space diversion. Principles and guidance concerning the ra management of storage space are contained in TM 38— and TM ——1.

Program funtions are as follows:. Shelf-life item An item of supply possessing deteriorative or unstable characteristics to the degree that a storage time period must be assigned to ensure that it will perform satisfactorily in service. From contingency or wartime scenario planning documents, estimate the total covered storage requirements in thousands of CF if significantly different from the requirements previously reported.

Each of these groups will be broken down by classes of supply. The report will reflect the storage space allocated and occupied by strategic and critical material at each installation and the quantity by commodity stored there. Installations other than depots will forward reports through appropriate command channels.

Shed space may be used for— 1 Material slightly sensitive to moisture. The gross amount of storage space occupied by material indicated in 74-03 b.

Procedures are included in SB —1 and supporting publications. Use approved facilities, equipment, methods, and approved standing operating procedures. The criterion to be applied is xr real propertyand improvements thereon, located on contiguous land under the control of the Army, will be considered as one installation regardless of missions, functions, activities, or installation classification that may be located thereon.

Enter the ACF of storage areas designated for rack storage. Explosive safety site plans will be submitted through command safety channels to Director, U. The maintenance provided in each phase of the prepositioned material cycle will be as follows:.